The Amazing Transportation System

My group has finished the ask,imagine,plan, and create stages and now we are on the improve stage.The improvements that I made to the train were improving the design and also improving the track. We improved the track by taking out the middle strip because we couldn’t fit two rows of ring magnets in between on strip magnet in the middle and one on each side of the box. So we took out the middle strip magnet so that we could fit two rows of strip magnets.

Our groups final train and track were had two strip magnets on each side because we had a problem with the magnets earlier. The problem was that the magnets were not facing the same sides and poles so we tried to fix it but we ran out of time so our final design was the strip magnets. The final design of our transportation system was less complicated and less hard to build but it did cary marbles and miss badurski said that if it carried at least a marble, and it still levitated, it would count as being successful, our group carried eight marbles.

I learned from the process that it is okay to mess up because you can always improve the design and you can always make it better. I learned that maglev trains levitate and can go very fast. I learned that the E D P helps you build the transportation system and help improve a design if you need to. When you work in a group, everyone has ideas for building the transportation system. More ideas, the better.

Leave a Reply

Your email address will not be published. Required fields are marked *