Rube Goldberg #5

We had almost finished building the project. It was frustrating since all the dominoes kept falling down but we did it. Almost. It was at a corner and we didn’t know what to do. Barbara and I had to go soon so Hana said she would finish it.

We had already done a lot. A marble will go down a PVC pipe which will fall down a wooden marble track set which will send the marble down the plastic tracks knocking into a domino trail that  hits a train that goes down train tracks to hit a bottle of something.

We had reached that far with building, on our plan it said the bottle hit toilet paper that hit another bottle that hit a container of candy which dumps the candy in the jar of candy. Hana promised she would try to film it but I was still worried.

 

One thought on “Rube Goldberg #5”

Leave a Reply

Your email address will not be published. Required fields are marked *